Boiler Header

DHB Boiler’s Industrial Boiler Headers are the backbone of reliable thermal power generation—engineered to ensure consistent flow distribution, superior structural integrity, and maximum operational flexibility under extreme conditions. Whether used in radiant or convective sections, our headers play a vital role in distributing and collecting fluid or steam from multiple tubes with precision and durability.

Technical Specifications

Steam Header Body DiameterCustomization
Machinery Test ReportProvided
Body MaterialsCarbon Steel (SA106 B), Alloy Steel (P11,P12,P22) etc
TypeHeader body, end cover, tube joint, hand hole, thermometer socket ,seamless steel tube, pressure parts
RemarksCustomized order is also accepted
Working Pressure1mpa – 40mpa, depend on material
StandardASME, PED, GB
DimensionCustomization
WeldingSMAW, SAW, GTAW (TIG)
Manufacturing ProcessMaterial → Cutting → Drilling → Tube Joints Welding → Attachments Welding → Heat Treatment → Hydro Test → Painting → Packing

✓ Critical Flow Distribution & Pressure Containment

Ensure optimal system balance and heat transfer performance:
→ Delivers uniform flow to parallel tube circuits with ≤5% deviation, preventing overheating or flow starvation
→ Pressure-balancing design eliminates localized failures, supporting stable, high-efficiency operation
→ Built with high-strength SA-335 P91 alloy, rated for up to 280 bar and 580°C, ideal for high-pressure environments

✓ Structural Integrity Enhancement

Longer service life, fewer failures, less downtime:
→ Reduces weld points by 70% compared to direct tube connections—cutting fatigue and inspection complexity
→ Thick-walled construction (38–150mm) withstands over 100,000 thermal cycles without cracking
→ Integrated support systems suppress vibrations, cutting crack formation risk by 90%

✓ Maintenance & Inspection Efficiency

Lower inspection costs and faster turnaround times:
→ Strategically placed access ports simplify ultrasonic and radiographic testing, reducing inspection time by 50%
→ Removable end caps allow internal access for cleaning, minimizing downtime by up to 3 days per year
→ Stub tube precision alignment ensures high-quality welds with <0.2% rework rate

✓ Operational Flexibility

Built to adapt to fluctuating thermal and pressure demands:
→ Bellows-type expansion joints absorb up to 300mm movement, preventing stress damage during thermal cycling
→ Optional chemical injection ports enable oxygen control below 7 ppb, ensuring steam purity
→ Handles rapid load shifts with 20%/min ramp rate, ideal for supercritical and ultra-supercritical boilers

FREE DESIGN

Need Expert Boiler Advice?Let our engineers guide yourproject from start to finish.

Why Choose DHB Boiler?

DHB Boiler delivers certified, high-performance boiler systems and pressure parts backed by over 20 years of engineering expertise. From design to installation, we ensure reliable quality, global compliance, and responsive service—trusted by clients in 50+ countries.

1.Certified with ASME, ISO, and A-Class licenses
2.100% in-house design, fabrication & testing 3.Responsive support team with 24/7 service
4.Long service life and high thermal efficiency 5.Customization for every boiler system & component

Fair&Certification

Certifications are DHB Boiler 's greatest strength.Meets the needs of all markets, and the source factories are fully certified to ensure quality.

Related Category

Certifications are DHB Boiler 's greatest strength.Meets the needs of all markets, and the source factories are fully certified to ensure quality.

FAQ

You still don’t know how to buy a boiler? This is the problem that our experienced engineers summarize. It’s what you encounter when you buy or use the boiler! If here don’t have the answer you want, please contact us. DHB Boiler will answer for you!
What is Boiler Header?

Boiler headers or boiler manifolds are designed to simplify piping near the boiler and reduce installation time, labor costs, and parts used. Available in various branch options with threaded inlet and outlet connections.

For closed loop heating applications only.

The efficiency of the working medium can be improved; the size, number, and layout of the tubes in the upper, middle, and lower parts of the boiler are different, so the header is responsible for connecting the sections to ensure the smooth flow of the working medium.

Usually the warranty period of our equipment is 12 months after the B/L date (except spare parts) . We can negotiate with each other under special circumstances.
Please share the boiler specifications or design drawings with us. We’ll then provide a comprehensive quotation immediately through your preferred channel—be it email, WhatsApp, or any other communication platform.
We support various modes of transportation, such as by sea, by land and by air. You can choose any mode of transportation according to your actual situation.
Our standard production cycle is 30-60 days from order confirmation. Final delivery schedules may vary depending on technical specifications and supply chain conditions.
We usually accept T/T. If you want other payment mode, we can negotiate.
Of course. Just tell us your country and schedule, we will pick you up to our factory.
We provide a complete set of boiler design solution and quotation, including model selection, technical parameters, boiler room design, boiler installation guidance and commissioning, etc., as long as you tell us your requirements.

Related Blog

Scroll to Top

Request A Quote

Please enable JavaScript in your browser to complete this form.